Products: General technical data.
Construction of the drilled piles is vibration-free and silent - without environmental impact.
Even deep drill holes are executed continuously, in a single operation. On request, even greater drilling depths are possible using linked drill rods.
Inclination of the drilled piles is technically possible up to an angle of 1:5/1:4.
Using special tracked running gear, the construction of drilled piles is also possible on building sites with limited space such as gaps between buildings or in narrow streets. Movement of the machines over long distances is via heavy-duty transporter.
For pile construction, only materials are used which conform to the relevant standards and technical specifications and are supplied exclusively by certified companies. The operation is performed by trained technical personnel using the company’s own concrete pumps.
Normally, drill pile concrete is processed in compliance with DIN 4014/EN1536, quality class C 20/25. However, all other strength and exposure classes are available, depending on requirements.
The construction of each individual drilled pile is computer controlled, digitally monitored and documented.
DEKRA Intertek Certification
The global certification network association hereby certifies that JACBO Pfahlgründungen GmbH has implemented ... more
– Updated on 2010-09-10 –


